DMAIC
A type of structured improvement cycle.
Prodability definition
DMAIC is the structured improvement cycle of Six Sigma, organized in five phases: Define, Measure, Analyze, Improve, Control. Compared with PDCA it adds a formal measurement phase, which weighs the process data before the intervention and checks their dispersion afterward. That makes it suited to processes with lots of data and variability to reduce, where the gap between one result and the next matters more than the single defect. In a company with fewer than 50 employees it is rarely the first choice: PDCA follows the same logic with a lighter measurement setup and with data within reach of the people who already work in the process.
Understand the concept in depth
A guided exercise in three phases: your own definition, exploring the sources, and comparison with the parts that hold the concept together.
DMAICNot to be confused with
- PDCA
PDCA goes through the same cycle in four phases and with a lighter measurement setup; DMAIC separates measurement into a phase of its own and requires it to be formalized. Below 50 employees the difference weighs on the data available more than on the logic.
- Six Sigma
Six Sigma is the variability reduction program as a whole; DMAIC is the operating cycle that program uses to tackle a single problem. The first is the framework, the second the work sequence.
Other perspectives on the concept
Authoritative definitions from different angles, to compare in the “Help me understand” exercise.
A PDCA with the measurement phase made mandatory and separate: you define the problem, measure the process, analyze the data collected, intervene and keep the result under control over time.
