{"meta":{"slug":"meeting-deadlines","area":"produttivita","tipologia":"Sintomo","data":"2026-11-04","autore":"Marco Belzani","redazione":"Dalia Bartiromo","meta_title":"Meeting deadlines: the mistake that wastes your time","meta_description":"Working longer won't help you meet a deadline. Learn which mistakes undermine planning and which strategies help you set deadlines you can keep.","keyword_principale":"how to meet deadlines","keywords_secondarie":"planning fallacy, time estimation, underestimating time, setting realistic deadlines, intermediate milestones","tags":["Time management","Operational planning","Project management","Problem solving"],"title":"Meeting deadlines","lunghezza":"20 min read","featuredVisual":{"kind":"image","src":"/article-assets/rispettare-le-scadenze/rispettare-le-scadenze.jpg","alt":"Meeting deadlines"}},"content":"# Meeting deadlines\n\nA task that takes longer than expected, a delivery that slips, a project that drags on past the agreed date. How often do you fail to meet a deadline, even when it had been planned?\n\nSituations like these are common, and they are often blamed on unexpected events, excessive workloads or not enough time.\n\nDoes the delay always depend on what happens while the work is being done? And what if part of the problem was already there at the moment the deadline was set?\n\n## The problem: missing deadlines\n\nIt often happens that you reach a deadline out of breath, working under pressure and, sometimes, still failing to meet it.\n\nThe problem of missed deadlines **can show up in different ways**: you work in **emergency mode**, you feel the **need for more time**, or **you sacrifice other activities** just to try to deliver by the agreed date.\n\nA good way to measure the problem and see how present it is in your daily life is to answer the following questions:\n\n1. On a scale of 1 to 10, how much do you work in a rush and under pressure?\n2. On a scale of 1 to 10, how often do you feel you need more time?\n3. On a scale of 1 to 10, how often do you give up other activities to meet deadlines?\n\nWhen we talk about deadlines, we do not only mean those set **with other people, but also** those set **with yourself.**\n\nIn general, the deadlines that are met most often are those agreed with other people. When it comes to personal deadlines, on the other hand, people tend to take them less seriously or not to set them at all.\n\nCounting the deadlines you miss with yourself makes it clearer how much the problem weighs on everyone's life: just think of postponed medical check-ups, put-off family commitments, and personal or professional activities that would improve your life but end up among next year's good intentions.\n\nIdentifying the types of deadlines you struggle to meet is also important to analyze and better understand the problem. Missed deadlines occur, in fact, more often with two types of activities:\n\n* **Complicated activities:** a complex activity is harder to estimate, because it can involve many phases and variables and therefore a higher chance of delay.\n* **Activities done for the first time:** when there is no previous experience, it becomes harder to predict how much time the work will take.\n\nSo missing deadlines is not only about delays: it involves the way work is organized, how priorities are managed and how personal commitments are carried forward.\n\nUnderstanding what a deadline really is makes it easier to recognize what happens when one is missed, which situations are part of the problem and what consequences can follow. That is why it helps to start from the definition of a deadline.\n\n### The hidden meaning in the definition of a deadline\n\nTo understand the problem, you first need to clarify what a deadline is and which elements define it.\n\nA deadline is a set point in time by which an activity must be completed, a commitment must be fulfilled or a result must be delivered.\n\nThe definition is confirmed by several Italian dictionaries:\n\nTreccani defines *scadenza* (deadline) as the \"term within which an obligation must be performed\" and, more broadly, as the period or term within which a given event must take place\n\nThe De Mauro dictionary defines it as a \"term set in advance for carrying out an activity, the duration of an office, of a job, etc.\"\n\nSabatini-Coletti describes it as a \"period of time within which a commitment must be honored\".\n\nStarting from this definition, it is possible to identify some elements that characterize a deadline and help to better understand its implications:\n\n* **Term:** a date by which something must be completed.\n* **End date:** the moment when the period of validity ends.\n* **No validity past the end date:** what must be delivered loses value or validity once the term has passed.\n* **Verification:** the possibility of checking whether the agreed goal has been reached.\n* **Agreement on who sets and who receives the goal:** a deadline implies an agreement between a party that asks for a result and a party that commits to achieving it.\n\nThe etymology of the word also helps to better understand its meaning.\n\nThe Italian word *scadenza* comes from the verb *scadere*, which derives from the Late Latin excadēre, a variant of the Classical Latin excidĕre, made up of:\n\nex-: a prefix indicating movement outward;\n\ncadĕre: \"to fall\".\n\nIts original meaning is therefore \"to fall out\".\n\n**The term thus indicates something that falls out of its period of validity and loses value.**\n\nAt work, then, delivering after the deadline does not simply mean being late. It also means that **what is delivered may have lost part of its value and caused harm**.\n\nGoing past a cut-off date means a loss of value, which turns into waste, and it can cause harm both to the other party to the agreement and to yourself. Missing a deadline, in fact, can undermine trust.\n\nAn agreement that is not kept leads to a loss of reliability and, as a result, of trust.\n\nSome English words also help to understand the meaning of a deadline:\n\n**Deadline:** literally, a \"dead line\". In the nineteenth century the word was already used to indicate a boundary line that prisoners could not cross without risking being killed. The meaning of a time limit developed later in the context of the American press and journalism, where it indicated the time by which a story had to be ready to go to print.\n\n**Expire:** it means to come to an end, but it also recalls the idea of breathing one's last. It indicates something that ends and reaches the end of its life.\n\n**A deadline, then, already carries consequences within it: going past the term is not a neutral event, but can cause a loss of value and harm.**\n\n**If missing deadlines leads to loss and harm, why is it so hard to meet them?**\n\nAmong the many causes that can lead to missed deadlines, one of the most important is the **difficulty of estimating the time needed to complete an activity**.\n\nNot all deadlines are equally hard to estimate. Some have features that make their duration relatively easy to predict, while others involve more variables and make the forecast uncertain.\n\nRecognizing these differences matters because it lets you judge how reliable an estimate is before agreeing to a deadline.\n\n**A single task is easier to estimate than a project.** A task with a clear start and finish has fewer variables than a project made up of several phases.\n\n**A short-term task is easier to estimate than a long-term one.** Over a longer period, more events can occur that jeopardize the deadline.\n\n**A task you have done before is easier to estimate than something you have never done.** Experience gives you reference points for the time needed, while lack of experience makes the forecast more uncertain.\n\n**A task under your control is easier to estimate than one that also depends on others.** When the result depends on other people, variables come into play that cannot be controlled directly.\n\n![Difficulty of estimating deadlines: simple deadlines (a single task, short term, done before, under my control) compared with complicated deadlines (a project, long term, never done before, not under my control)](/article-assets/rispettare-le-scadenze/rispettare-le-scadenze-difficolta-di-stima.jpg)\n\nTo meet a deadline, then, it is not enough to know the date by which an activity must be completed. You also need to decide when to start and how much time to devote to the work, taking into account the type of activity and the variables that can affect timing.\n\n**All of this requires one fundamental skill**: **estimating the time needed to complete an activity.**\n\nBut how accurate is this ability to estimate in your own life? Why is the time needed so often underestimated?\n\nScientific research has studied these questions at length, showing how common it is to underestimate working times and which variables affect the ability to make accurate forecasts.\n\n### What science says about estimating time and meeting deadlines\n\nTo better understand the problem of missed deadlines, it helps to look at scientific research through two questions:\n\n1. By how much do we get time estimates wrong, on average?\n2. Why do we keep underestimating time even after making the same mistake in the past?\n\n**By how much do we get time estimates wrong, on average?**\n\nTo answer the first question, we need to consider the phenomenon known as the **planning fallacy**.\n\nIt is a cognitive bias whereby **people systematically underestimate the time needed to complete a task or a project**. This tendency comes with excessive optimism: even when you know that similar tasks took longer than expected in the past, you keep making overly optimistic estimates.\n\nBuehler, Griffin and Ross (1994)\\*1 analyzed this phenomenon in a series of studies, observing that people tend to predict completion times shorter than the actual ones, for both academic and non-academic tasks. The researchers also found that, when making predictions, people tend to focus mainly on how they plan to do the work, rather than using past experience as a reference.\n\nThe difficulty of meeting timelines does not only concern individual tasks, but also large projects. In the book How Big Things Get Done, Flyvbjerg and Gardner (2023)\\*2 report the results of an analysis of more than 16,000 projects: only 8.5% were completed on time and on budget at the same time.\n\n**Underestimating timelines, then, is a widely documented phenomenon**, affecting activities of different kinds and complex projects. It is not simply an occasional planning error, but a tendency that can recur even when you have previous experience.\n\n**Why do we keep underestimating time even after making the same mistake in the past?**\n\nTo answer the second question, it is useful to look at some studies that analyzed the cognitive and social mechanisms behind overly optimistic predictions.\n\nThe more you want to finish early, the more optimistic your estimate becomes.\n\nWhen you have a personal interest in completing a task quickly, your forecast can be influenced by that motivation.\n\nBuehler, Griffin and MacDonald (1997)\\*3 observed that incentives to finish a task quickly strengthen the tendency to underestimate time. In one of the experiments, the researchers found that financial incentives to complete a task early led to more optimistic predictions. This effect went together with greater attention to one's future plans and less consideration of past experience.\n\nThe mechanism can also matter at work: when you want to win an assignment or not disappoint a client, your interest in meeting a certain timeline can influence the forecast, leading you to commit to a shorter deadline than is actually needed.\n\n**When you state an estimate in front of someone, you tend to be less accurate**. When the forecast is made anonymously, the distortion can disappear.\n\nThe social context in which a prediction is expressed can also affect time estimates. Pezzo, Pezzo and Stone (2006)\\*4 analyzed the role of concern about the image you project to others.\n\nIn their experiment, participants had to predict how long it would take them to complete a task. Some stated their prediction out loud in front of another person, while others gave it anonymously. The results showed that the predictions stated out loud showed the typical underestimation of time, while the anonymous ones did not show the same error and were more accurate.\n\nThe presence of another person, then, can introduce a concern about your own image. To come across well to others, you may end up committing to a shorter deadline than the one you would have given anonymously.\n\n**We also get estimates wrong because we misremember how long things took us before**. Knowing the actual times, through concrete measurements, makes forecasts more accurate.\n\nWhen you have to estimate the time needed for a task you have already done, you tend to use memory as a reference. The problem is that the memory of actual times can be imprecise and, as a result, it can also affect later forecasts.\n\nRoy, Mitten and Christenfeld (2008)\\*5 studied exactly this mechanism, testing whether giving people concrete information about how long previous tasks actually took could improve the accuracy of their predictions. The experiments involved different tasks, including counting sheets of paper and writing a text. In the third experiment, participants instead received information on the average time other people took to complete a task. In all three experiments, providing concrete information about task duration improved the accuracy of the estimates.\n\nThe results therefore show that relying only on the memory of past experience can lead to less accurate forecasts, while using concrete data on task duration makes it possible to correct memory distortions and improve the ability to estimate time.\n\nResearch, then, shows that underestimating time is a widespread tendency that can depend on several factors: excessive optimism, personal interests, social context and imprecise memory of past experience. But what consequences does this difficulty in making realistic estimates have?\n\nTo fully understand the problem, we need to look at the effects of missed deadlines.\n\n## The effects of missed deadlines\n\nMissing deadlines can trigger a series of consequences that affect the work, the people involved and the scheduling of activities.\n\n1. **Growing backlog:** missing a deadline means more work to catch up on. This leads to more fatigue and takes time away from personal activities.\n2. **Knock-on delays for colleagues:** a delay can jeopardize other people's work. When a task is not delivered on time, the team's subsequent deliveries can slip too.\n3. **Loss of reliability with colleagues and clients:** failing to keep agreements on deadlines undermines trust. Those who do not deliver on time risk being seen as less reliable.\n4. **Rising costs:** if a certain number of working hours had been planned, but completing the task takes more, costs go up. Unplanned extra time can turn into a financial loss.\n5. **Lower quality:** you may manage to deliver on time, but only by rushing. In this case, the deadline is met at the expense of the quality of the result.\n6. **Harder future scheduling:** when a deadline slips, other planned activities can be affected too. You have to move later commitments and reorganize your calendar, which creates even more work.\n\nThe consequences of missed deadlines, then, are not limited to the late delivery of a task. They can disrupt how work is organized, raise costs, lower the quality of results and put the people involved in a difficult position.\n\nTo keep these negative effects from recurring, you need to solve the problem for good and identify the condition that allows deadlines to be managed effectively. But what is the right goal to aim for?\n\n## The right goal to aim for in meeting deadlines\n\nTo solve a problem, the first step is to clearly define the goal to reach. This step is essential because, if you pick the wrong goal, the solution is likely to be ineffective too: you will end up working on a condition that does not really solve the problem.\n\nIn the case of missed deadlines, the goal, that is, the desirable ideal condition, might simply seem to be meeting deadlines. But is that really the result to aim for?\n\n**Meeting deadlines** is a **wrong ideal condition**.\n\nThis formulation assumes, in fact, that the deadline must be met at any cost, even when that has negative effects on your personal life, on the quality of the work or on your stress level.\n\nIt is an ideal condition that comes into play at the end of the process: the goal is to deliver by the set date, regardless of how you got there.\n\n**The correct ideal condition**, instead, is to **agree on deadlines that can be met, given the available resources**.\n\nIn this case, the focus shifts from execution to the initial phase of the process, before an agreement is even made. **The goal is not simply to meet a deadline, but to set a realistic and sustainable term from the start.**\n\nIf the ideal condition changes, the solution to the problem changes too: it is no longer about managing to meet a deadline that has already been set, but about agreeing on a deadline that can actually be met.\n\n## What leads to missed deadlines\n\nWhen you start from a wrong assumption in solving a problem, the solution is likely to be wrong too.\n\nOnce the ideal condition to reach has been defined, you need to understand what prevents you from achieving it.\n\nThis means identifying the real causes of the problem, rather than just working on its symptoms. If you start from the wrong cause, in fact, you risk adopting solutions that seem logical but do not lead to the desired condition.\n\nKnowing the most common false solutions helps you recognize why the problem keeps coming back, even when you are already trying to solve it.\n\n### The most common false solutions for meeting deadlines\n\nFalse solutions are those that are routinely adopted to try to meet deadlines, but that do not address the causes of the problem. Here are some of the most popular:\n\n* **Working overtime:** extending the time spent working to try to complete the task by the deadline. In this way, you try to make up for an insufficient initial estimate by adding working hours.\n* **Adding a buffer \"by eye\" to the deadline:** adding extra time without relying on concrete data. Since the initial estimate is approximate and tends to be too low, the added buffer can also turn out to be insufficient.\n* **Finding excuses to push deadlines back:** using reasons that allow the agreed date to be moved. If this behavior becomes a habit, missing deadlines becomes normal.\n\nThe solutions described try to fix missed deadlines by acting on their consequences, not on the causes that produce them.\n\nWorking more hours, adding buffers or moving dates may seem useful in the short term, but it does not help you understand why deadlines are not met.\n\nTo deal with the problem effectively, you need to analyze at which points in the process the errors arise: from making the agreement, to scheduling the work, to carrying it out.\n\n### The real causes of missed deadlines\n\nThe causes of missed deadlines can show up at three distinct points in the process: when the agreement is made, when the work is scheduled and when it is carried out.\n\n1. **When agreeing, underestimating the deadline without checking it, out of self-interest.**\n\n   When a deadline is agreed, you commit to a shorter term than is actually needed, without first checking whether the timeline is feasible. In this case, the time estimate is influenced by your interest in winning a job or satisfying the client's request.\n2. **When scheduling, estimating \"by feel\", without data on your actual times.**\n\n   Scheduling is based on a subjective perception of the time needed, rather than on concrete data. If the actual time spent on tasks has never been measured, there are no realistic reference points on which to build an estimate.\n3. **When executing, not checking intermediate deadlines.**\n\n   When no intermediate deadlines are set, it becomes hard to notice in time that a task is taking longer than expected. The delay only emerges when the final deadline is approaching or has already passed, making it harder to step in.\n\nIdentifying the causes of missed deadlines shows you where to act to really solve the problem. These are the gaps to close in order to move from temporary fixes to a concrete and lasting solution.\n\nThe practical tips that follow turn this analysis into specific actions, designed to address the causes identified and improve the way deadlines are set, scheduled and managed.\n\n## Practical tips for meeting deadlines\n\nTo tackle the problem of missed deadlines, you can adopt a few measures that improve the agreement phase, scheduling and the monitoring of execution, acting directly on the real causes of the problem.\n\n1. **Don't answer right away.**\n\n   Before committing to a deadline date, it is important to check your schedule.\n\n   Taking the time to analyze the phases of the task, consider the variables that can affect its duration and check the rest of your schedule allows you to make a more realistic estimate.\n\n   It is also useful to make a first estimate in private, without being directly under pressure from the client. That way, the forecast can be based on an assessment of the work and not only on the need to give an immediate answer.\n2. **Measure your own times.**\n\n   Recording how much time you actually spend completing tasks lets you build a data set that is useful for future estimates.\n\n   Your forecasts can then start from actual average times, rather than from a subjective perception or an imprecise memory.\n\n   Starting to measure your times means getting in touch with the real timelines of your tasks and gaining more reliable reference points for scheduling.\n3. **Set intermediate milestones and delay signals.**\n\n   Breaking the work down into intermediate milestones lets you check progress step by step and see early on whether delays are building up.\n\n   When a project is large, it can be hard to estimate the final deadline precisely. In these cases, you can set a first deadline and treat the following ones as forecasts to be updated during execution.\n\n   From one milestone to the next, forecasts can be confirmed or adjusted based on the actual progress of the work.\n\n   Delay signals are indicators that let you check whether the activities planned for each milestone have been completed on time. This way, you can spot early any deviation from the schedule and step in before the delay jeopardizes the final deadline.\n\n![Three steps for meeting deadlines: 1. take some time before agreeing to a deadline; 2. break the task down into phases and estimate the time for each phase; 3. only agree to deadlines you can keep](/article-assets/rispettare-le-scadenze/rispettare-le-scadenze-tre-passi.jpg)\n\n**Final check**\n\nBefore setting a deadline, it helps to check a few elements that allow you to define a realistic and achievable term.\n\n1. **What exactly needs to be delivered?** The result to be delivered must be defined unambiguously, so that it is clear which goal has to be reached.\n2. **Has the work been broken down into phases, with the time estimated for each one?** Splitting the task into phases helps you better understand the work required and estimate its overall duration.\n3. **Is the estimate based on real data (similar tasks, your own or other people's)?** Using concrete reference points makes the forecast more accurate than an estimate based only on gut feeling.\n4. **Does this task have time blocked out in the calendar?** Checking that the work has time actually available in your schedule helps you see whether the deadline is compatible with your other commitments.\n5. **Does this task depend on someone else (materials, answers, approvals)? What will you do if something goes wrong?** Identifying dependencies on other people or external factors lets you consider the variables that could jeopardize the timeline and decide how to deal with them.\n\nChecking these points before setting a deadline allows you to define a term based on the work to be done, the available resources and the conditions needed to meet it.\n\nIn conclusion, missing deadlines is not just a matter of delays or lack of time. Often the problem starts much earlier, when terms are agreed without checking their feasibility, work is planned on rough estimates and progress is not monitored.\n\nAs scientific research shows, the tendency to underestimate time is widespread and can be fueled by excessive optimism, personal interests, social pressure and an inaccurate assessment of past experience. The consequences, however, go well beyond a late delivery: costs rise, backlogs build up, the quality of the work suffers and you risk losing other people's trust.\n\nThe solution, then, is not to work longer or to keep finding new time buffers, but to agree on realistic deadlines that fit the available resources. To do so, you need to base estimates on concrete data, check your schedule before making a commitment and monitor the work through intermediate milestones.\n\nMeeting a deadline, ultimately, means above all creating from the start the conditions that allow it to be met, without having to sacrifice the quality of the work, your other commitments or your own time.\n\n## Sources and references\n\n\\*1 Buehler, R., Griffin, D., & Ross, M. (1994). Exploring the \"planning fallacy\": Why people underestimate their task completion times. Journal of Personality and Social Psychology, 67(3), 366–381.\n\n\\*2 Flyvbjerg, B., & Gardner, D. (2023). How Big Things Get Done: The Surprising Factors Behind Every Successful Project, from Home Renovations to Space Exploration. Crown Currency. ISBN: 9780593239513.\n\n\\*3 Buehler, R., Griffin, D., & MacDonald, H. (1997). The role of motivated reasoning in optimistic time predictions. Personality and Social Psychology Bulletin, 23(3), 238–247.\n\n\\*4 Pezzo, S. V., Pezzo, M. V., & Stone, E. R. (2006). The social implications of planning: How public predictions bias future plans. Journal of Experimental Social Psychology, 42(2), 221–227.\n\n\\*5 Roy, M. M., Mitten, S. T., & Christenfeld, N. J. S. (2008). Correcting memory improves accuracy of predicted task duration. Journal of Experimental Psychology: Applied, 14(3), 266–275.","path":"content/articles/art-0192/en.md","routePath":"meeting-deadlines","wordCount":4176,"imageMeta":{"/article-assets/rispettare-le-scadenze/rispettare-le-scadenze.jpg":{"w":1600,"h":886},"/article-assets/rispettare-le-scadenze/rispettare-le-scadenze-difficolta-di-stima.jpg":{"w":1178,"h":622},"/article-assets/rispettare-le-scadenze/rispettare-le-scadenze-tre-passi.jpg":{"w":1600,"h":606}},"html":"<p>A task that takes longer than expected, a delivery that slips, a project that drags on past the agreed date. How often do you fail to meet a deadline, even when it had been planned?</p>\n<p>Situations like these are common, and they are often blamed on unexpected events, excessive workloads or not enough time.</p>\n<p>Does the delay always depend on what happens while the work is being done? And what if part of the problem was already there at the moment the deadline was set?</p>\n<h2 id=\"the-problem-missing-deadlines\" class=\"article-h2-retrowave\"><span>The problem: missing deadlines</span><button type=\"button\" class=\"article-heading-link\" data-copy-id=\"the-problem-missing-deadlines\" aria-label=\"Copy link to section\"><svg xmlns=\"http://www.w3.org/2000/svg\" width=\"16\" height=\"16\" viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M9 17H7A5 5 0 0 1 7 7h2\"/><path d=\"M15 7h2a5 5 0 1 1 0 10h-2\"/><line x1=\"8\" x2=\"16\" y1=\"12\" y2=\"12\"/></svg></button></h2>\n<p>It often happens that you reach a deadline out of breath, working under pressure and, sometimes, still failing to meet it.</p>\n<p>The problem of missed deadlines <strong>can show up in different ways</strong>: you work in <strong>emergency mode</strong>, you feel the <strong>need for more time</strong>, or <strong>you sacrifice other activities</strong> just to try to deliver by the agreed date.</p>\n<p>A good way to measure the problem and see how present it is in your daily life is to answer the following questions:</p>\n<ol class=\"article-process-list\">\n<li>On a scale of 1 to 10, how much do you work in a rush and under pressure?</li>\n<li>On a scale of 1 to 10, how often do you feel you need more time?</li>\n<li>On a scale of 1 to 10, how often do you give up other activities to meet deadlines?</li>\n</ol>\n<p>When we talk about deadlines, we do not only mean those set <strong>with other people, but also</strong> those set <strong>with yourself.</strong></p>\n<p>In general, the deadlines that are met most often are those agreed with other people. When it comes to personal deadlines, on the other hand, people tend to take them less seriously or not to set them at all.</p>\n<p>Counting the deadlines you miss with yourself makes it clearer how much the problem weighs on everyone's life: just think of postponed medical check-ups, put-off family commitments, and personal or professional activities that would improve your life but end up among next year's good intentions.</p>\n<p>Identifying the types of deadlines you struggle to meet is also important to analyze and better understand the problem. Missed deadlines occur, in fact, more often with two types of activities:</p>\n<ul class=\"article-check-list\">\n<li><strong>Complicated activities:</strong> a complex activity is harder to estimate, because it can involve many phases and variables and therefore a higher chance of delay.</li>\n<li><strong>Activities done for the first time:</strong> when there is no previous experience, it becomes harder to predict how much time the work will take.</li>\n</ul>\n<p>So missing deadlines is not only about delays: it involves the way work is organized, how priorities are managed and how personal commitments are carried forward.</p>\n<p>Understanding what a deadline really is makes it easier to recognize what happens when one is missed, which situations are part of the problem and what consequences can follow. That is why it helps to start from the definition of a deadline.</p>\n<h3 id=\"the-hidden-meaning-in-the-definition-of-a-deadline\">The hidden meaning in the definition of a deadline</h3>\n<p>To understand the problem, you first need to clarify what a deadline is and which elements define it.</p>\n<p>A deadline is a set point in time by which an activity must be completed, a commitment must be fulfilled or a result must be delivered.</p>\n<p>The definition is confirmed by several Italian dictionaries:</p>\n<p>Treccani defines <em>scadenza</em> (deadline) as the \"term within which an obligation must be performed\" and, more broadly, as the period or term within which a given event must take place</p>\n<p>The De Mauro dictionary defines it as a \"term set in advance for carrying out an activity, the duration of an office, of a job, etc.\"</p>\n<p>Sabatini-Coletti describes it as a \"period of time within which a commitment must be honored\".</p>\n<p>Starting from this definition, it is possible to identify some elements that characterize a deadline and help to better understand its implications:</p>\n<ul class=\"article-check-list\">\n<li><strong>Term:</strong> a date by which something must be completed.</li>\n<li><strong>End date:</strong> the moment when the period of validity ends.</li>\n<li><strong>No validity past the end date:</strong> what must be delivered loses value or validity once the term has passed.</li>\n<li><strong>Verification:</strong> the possibility of checking whether the agreed goal has been reached.</li>\n<li><strong>Agreement on who sets and who receives the goal:</strong> a deadline implies an agreement between a party that asks for a result and a party that commits to achieving it.</li>\n</ul>\n<p>The etymology of the word also helps to better understand its meaning.</p>\n<p>The Italian word <em>scadenza</em> comes from the verb <em>scadere</em>, which derives from the Late Latin excadēre, a variant of the Classical Latin excidĕre, made up of:</p>\n<p>ex-: a prefix indicating movement outward;</p>\n<p>cadĕre: \"to fall\".</p>\n<p>Its original meaning is therefore \"to fall out\".</p>\n<p><strong>The term thus indicates something that falls out of its period of validity and loses value.</strong></p>\n<p>At work, then, delivering after the deadline does not simply mean being late. It also means that <strong>what is delivered may have lost part of its value and caused harm</strong>.</p>\n<p>Going past a cut-off date means a loss of value, which turns into waste, and it can cause harm both to the other party to the agreement and to yourself. Missing a deadline, in fact, can undermine trust.</p>\n<p>An agreement that is not kept leads to a loss of reliability and, as a result, of trust.</p>\n<p>Some English words also help to understand the meaning of a deadline:</p>\n<p><strong>Deadline:</strong> literally, a \"dead line\". In the nineteenth century the word was already used to indicate a boundary line that prisoners could not cross without risking being killed. The meaning of a time limit developed later in the context of the American press and journalism, where it indicated the time by which a story had to be ready to go to print.</p>\n<p><strong>Expire:</strong> it means to come to an end, but it also recalls the idea of breathing one's last. It indicates something that ends and reaches the end of its life.</p>\n<p><strong>A deadline, then, already carries consequences within it: going past the term is not a neutral event, but can cause a loss of value and harm.</strong></p>\n<p><strong>If missing deadlines leads to loss and harm, why is it so hard to meet them?</strong></p>\n<p>Among the many causes that can lead to missed deadlines, one of the most important is the <strong>difficulty of estimating the time needed to complete an activity</strong>.</p>\n<p>Not all deadlines are equally hard to estimate. Some have features that make their duration relatively easy to predict, while others involve more variables and make the forecast uncertain.</p>\n<p>Recognizing these differences matters because it lets you judge how reliable an estimate is before agreeing to a deadline.</p>\n<p><strong>A single task is easier to estimate than a project.</strong> A task with a clear start and finish has fewer variables than a project made up of several phases.</p>\n<p><strong>A short-term task is easier to estimate than a long-term one.</strong> Over a longer period, more events can occur that jeopardize the deadline.</p>\n<p><strong>A task you have done before is easier to estimate than something you have never done.</strong> Experience gives you reference points for the time needed, while lack of experience makes the forecast more uncertain.</p>\n<p><strong>A task under your control is easier to estimate than one that also depends on others.</strong> When the result depends on other people, variables come into play that cannot be controlled directly.</p>\n<p><picture><source type=\"image/avif\" srcset=\"/article-assets/rispettare-le-scadenze/rispettare-le-scadenze-difficolta-di-stima-480w.avif 480w, /article-assets/rispettare-le-scadenze/rispettare-le-scadenze-difficolta-di-stima-960w.avif 960w, /article-assets/rispettare-le-scadenze/rispettare-le-scadenze-difficolta-di-stima-1600w.avif 1600w\" sizes=\"(min-width: 1024px) 860px, 100vw\"><source type=\"image/webp\" srcset=\"/article-assets/rispettare-le-scadenze/rispettare-le-scadenze-difficolta-di-stima-480w.webp 480w, /article-assets/rispettare-le-scadenze/rispettare-le-scadenze-difficolta-di-stima-960w.webp 960w, /article-assets/rispettare-le-scadenze/rispettare-le-scadenze-difficolta-di-stima-1600w.webp 1600w\" sizes=\"(min-width: 1024px) 860px, 100vw\"><img src=\"/article-assets/rispettare-le-scadenze/rispettare-le-scadenze-difficolta-di-stima.jpg\" alt=\"Difficulty of estimating deadlines: simple deadlines (a single task, short term, done before, under my control) compared with complicated deadlines (a project, long term, never done before, not under my control)\" width=\"1178\" height=\"622\" loading=\"lazy\" decoding=\"async\" class=\"article-inline-image\"></picture></p>\n<p>To meet a deadline, then, it is not enough to know the date by which an activity must be completed. You also need to decide when to start and how much time to devote to the work, taking into account the type of activity and the variables that can affect timing.</p>\n<p><strong>All of this requires one fundamental skill</strong>: <strong>estimating the time needed to complete an activity.</strong></p>\n<p>But how accurate is this ability to estimate in your own life? Why is the time needed so often underestimated?</p>\n<p>Scientific research has studied these questions at length, showing how common it is to underestimate working times and which variables affect the ability to make accurate forecasts.</p>\n<h3 id=\"what-science-says-about-estimating-time-and-meeting-deadlines\">What science says about estimating time and meeting deadlines</h3>\n<p>To better understand the problem of missed deadlines, it helps to look at scientific research through two questions:</p>\n<ol class=\"article-process-list\">\n<li>By how much do we get time estimates wrong, on average?</li>\n<li>Why do we keep underestimating time even after making the same mistake in the past?</li>\n</ol>\n<p><strong>By how much do we get time estimates wrong, on average?</strong></p>\n<p>To answer the first question, we need to consider the phenomenon known as the <strong>planning fallacy</strong>.</p>\n<p>It is a cognitive bias whereby <strong>people systematically underestimate the time needed to complete a task or a project</strong>. This tendency comes with excessive optimism: even when you know that similar tasks took longer than expected in the past, you keep making overly optimistic estimates.</p>\n<p>Buehler, Griffin and Ross (1994)<a class=\"article-citation\" href=\"#rif-1\">*1</a> analyzed this phenomenon in a series of studies, observing that people tend to predict completion times shorter than the actual ones, for both academic and non-academic tasks. The researchers also found that, when making predictions, people tend to focus mainly on how they plan to do the work, rather than using past experience as a reference.</p>\n<p>The difficulty of meeting timelines does not only concern individual tasks, but also large projects. In the book How Big Things Get Done, Flyvbjerg and Gardner (2023)<a class=\"article-citation\" href=\"#rif-2\">*2</a> report the results of an analysis of more than 16,000 projects: only 8.5% were completed on time and on budget at the same time.</p>\n<p><strong>Underestimating timelines, then, is a widely documented phenomenon</strong>, affecting activities of different kinds and complex projects. It is not simply an occasional planning error, but a tendency that can recur even when you have previous experience.</p>\n<p><strong>Why do we keep underestimating time even after making the same mistake in the past?</strong></p>\n<p>To answer the second question, it is useful to look at some studies that analyzed the cognitive and social mechanisms behind overly optimistic predictions.</p>\n<p>The more you want to finish early, the more optimistic your estimate becomes.</p>\n<p>When you have a personal interest in completing a task quickly, your forecast can be influenced by that motivation.</p>\n<p>Buehler, Griffin and MacDonald (1997)<a class=\"article-citation\" href=\"#rif-3\">*3</a> observed that incentives to finish a task quickly strengthen the tendency to underestimate time. In one of the experiments, the researchers found that financial incentives to complete a task early led to more optimistic predictions. This effect went together with greater attention to one's future plans and less consideration of past experience.</p>\n<p>The mechanism can also matter at work: when you want to win an assignment or not disappoint a client, your interest in meeting a certain timeline can influence the forecast, leading you to commit to a shorter deadline than is actually needed.</p>\n<p><strong>When you state an estimate in front of someone, you tend to be less accurate</strong>. When the forecast is made anonymously, the distortion can disappear.</p>\n<p>The social context in which a prediction is expressed can also affect time estimates. Pezzo, Pezzo and Stone (2006)<a class=\"article-citation\" href=\"#rif-4\">*4</a> analyzed the role of concern about the image you project to others.</p>\n<p>In their experiment, participants had to predict how long it would take them to complete a task. Some stated their prediction out loud in front of another person, while others gave it anonymously. The results showed that the predictions stated out loud showed the typical underestimation of time, while the anonymous ones did not show the same error and were more accurate.</p>\n<p>The presence of another person, then, can introduce a concern about your own image. To come across well to others, you may end up committing to a shorter deadline than the one you would have given anonymously.</p>\n<p><strong>We also get estimates wrong because we misremember how long things took us before</strong>. Knowing the actual times, through concrete measurements, makes forecasts more accurate.</p>\n<p>When you have to estimate the time needed for a task you have already done, you tend to use memory as a reference. The problem is that the memory of actual times can be imprecise and, as a result, it can also affect later forecasts.</p>\n<p>Roy, Mitten and Christenfeld (2008)<a class=\"article-citation\" href=\"#rif-5\">*5</a> studied exactly this mechanism, testing whether giving people concrete information about how long previous tasks actually took could improve the accuracy of their predictions. The experiments involved different tasks, including counting sheets of paper and writing a text. In the third experiment, participants instead received information on the average time other people took to complete a task. In all three experiments, providing concrete information about task duration improved the accuracy of the estimates.</p>\n<p>The results therefore show that relying only on the memory of past experience can lead to less accurate forecasts, while using concrete data on task duration makes it possible to correct memory distortions and improve the ability to estimate time.</p>\n<p>Research, then, shows that underestimating time is a widespread tendency that can depend on several factors: excessive optimism, personal interests, social context and imprecise memory of past experience. But what consequences does this difficulty in making realistic estimates have?</p>\n<p>To fully understand the problem, we need to look at the effects of missed deadlines.</p>\n<h2 id=\"the-effects-of-missed-deadlines\" class=\"article-h2-retrowave\"><span>The effects of missed deadlines</span><button type=\"button\" class=\"article-heading-link\" data-copy-id=\"the-effects-of-missed-deadlines\" aria-label=\"Copy link to section\"><svg xmlns=\"http://www.w3.org/2000/svg\" width=\"16\" height=\"16\" viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M9 17H7A5 5 0 0 1 7 7h2\"/><path d=\"M15 7h2a5 5 0 1 1 0 10h-2\"/><line x1=\"8\" x2=\"16\" y1=\"12\" y2=\"12\"/></svg></button></h2>\n<p>Missing deadlines can trigger a series of consequences that affect the work, the people involved and the scheduling of activities.</p>\n<ol class=\"article-process-list\">\n<li><strong>Growing backlog:</strong> missing a deadline means more work to catch up on. This leads to more fatigue and takes time away from personal activities.</li>\n<li><strong>Knock-on delays for colleagues:</strong> a delay can jeopardize other people's work. When a task is not delivered on time, the team's subsequent deliveries can slip too.</li>\n<li><strong>Loss of reliability with colleagues and clients:</strong> failing to keep agreements on deadlines undermines trust. Those who do not deliver on time risk being seen as less reliable.</li>\n<li><strong>Rising costs:</strong> if a certain number of working hours had been planned, but completing the task takes more, costs go up. Unplanned extra time can turn into a financial loss.</li>\n<li><strong>Lower quality:</strong> you may manage to deliver on time, but only by rushing. In this case, the deadline is met at the expense of the quality of the result.</li>\n<li><strong>Harder future scheduling:</strong> when a deadline slips, other planned activities can be affected too. You have to move later commitments and reorganize your calendar, which creates even more work.</li>\n</ol>\n<p>The consequences of missed deadlines, then, are not limited to the late delivery of a task. They can disrupt how work is organized, raise costs, lower the quality of results and put the people involved in a difficult position.</p>\n<p>To keep these negative effects from recurring, you need to solve the problem for good and identify the condition that allows deadlines to be managed effectively. But what is the right goal to aim for?</p>\n<h2 id=\"the-right-goal-to-aim-for-in-meeting-deadlines\" class=\"article-h2-retrowave\"><span>The right goal to aim for in meeting deadlines</span><button type=\"button\" class=\"article-heading-link\" data-copy-id=\"the-right-goal-to-aim-for-in-meeting-deadlines\" aria-label=\"Copy link to section\"><svg xmlns=\"http://www.w3.org/2000/svg\" width=\"16\" height=\"16\" viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M9 17H7A5 5 0 0 1 7 7h2\"/><path d=\"M15 7h2a5 5 0 1 1 0 10h-2\"/><line x1=\"8\" x2=\"16\" y1=\"12\" y2=\"12\"/></svg></button></h2>\n<p>To solve a problem, the first step is to clearly define the goal to reach. This step is essential because, if you pick the wrong goal, the solution is likely to be ineffective too: you will end up working on a condition that does not really solve the problem.</p>\n<p>In the case of missed deadlines, the goal, that is, the desirable ideal condition, might simply seem to be meeting deadlines. But is that really the result to aim for?</p>\n<p><strong>Meeting deadlines</strong> is a <strong>wrong ideal condition</strong>.</p>\n<p>This formulation assumes, in fact, that the deadline must be met at any cost, even when that has negative effects on your personal life, on the quality of the work or on your stress level.</p>\n<p>It is an ideal condition that comes into play at the end of the process: the goal is to deliver by the set date, regardless of how you got there.</p>\n<p><strong>The correct ideal condition</strong>, instead, is to <strong>agree on deadlines that can be met, given the available resources</strong>.</p>\n<p>In this case, the focus shifts from execution to the initial phase of the process, before an agreement is even made. <strong>The goal is not simply to meet a deadline, but to set a realistic and sustainable term from the start.</strong></p>\n<p>If the ideal condition changes, the solution to the problem changes too: it is no longer about managing to meet a deadline that has already been set, but about agreeing on a deadline that can actually be met.</p>\n<h2 id=\"what-leads-to-missed-deadlines\" class=\"article-h2-retrowave\"><span>What leads to missed deadlines</span><button type=\"button\" class=\"article-heading-link\" data-copy-id=\"what-leads-to-missed-deadlines\" aria-label=\"Copy link to section\"><svg xmlns=\"http://www.w3.org/2000/svg\" width=\"16\" height=\"16\" viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M9 17H7A5 5 0 0 1 7 7h2\"/><path d=\"M15 7h2a5 5 0 1 1 0 10h-2\"/><line x1=\"8\" x2=\"16\" y1=\"12\" y2=\"12\"/></svg></button></h2>\n<p>When you start from a wrong assumption in solving a problem, the solution is likely to be wrong too.</p>\n<p>Once the ideal condition to reach has been defined, you need to understand what prevents you from achieving it.</p>\n<p>This means identifying the real causes of the problem, rather than just working on its symptoms. If you start from the wrong cause, in fact, you risk adopting solutions that seem logical but do not lead to the desired condition.</p>\n<p>Knowing the most common false solutions helps you recognize why the problem keeps coming back, even when you are already trying to solve it.</p>\n<h3 id=\"the-most-common-false-solutions-for-meeting-deadlines\">The most common false solutions for meeting deadlines</h3>\n<p>False solutions are those that are routinely adopted to try to meet deadlines, but that do not address the causes of the problem. Here are some of the most popular:</p>\n<ul class=\"article-check-list\">\n<li><strong>Working overtime:</strong> extending the time spent working to try to complete the task by the deadline. In this way, you try to make up for an insufficient initial estimate by adding working hours.</li>\n<li><strong>Adding a buffer \"by eye\" to the deadline:</strong> adding extra time without relying on concrete data. Since the initial estimate is approximate and tends to be too low, the added buffer can also turn out to be insufficient.</li>\n<li><strong>Finding excuses to push deadlines back:</strong> using reasons that allow the agreed date to be moved. If this behavior becomes a habit, missing deadlines becomes normal.</li>\n</ul>\n<p>The solutions described try to fix missed deadlines by acting on their consequences, not on the causes that produce them.</p>\n<p>Working more hours, adding buffers or moving dates may seem useful in the short term, but it does not help you understand why deadlines are not met.</p>\n<p>To deal with the problem effectively, you need to analyze at which points in the process the errors arise: from making the agreement, to scheduling the work, to carrying it out.</p>\n<h3 id=\"the-real-causes-of-missed-deadlines\">The real causes of missed deadlines</h3>\n<p>The causes of missed deadlines can show up at three distinct points in the process: when the agreement is made, when the work is scheduled and when it is carried out.</p>\n<ol class=\"article-process-list\">\n<li>\n<p><strong>When agreeing, underestimating the deadline without checking it, out of self-interest.</strong></p>\n<p>When a deadline is agreed, you commit to a shorter term than is actually needed, without first checking whether the timeline is feasible. In this case, the time estimate is influenced by your interest in winning a job or satisfying the client's request.</p>\n</li>\n<li>\n<p><strong>When scheduling, estimating \"by feel\", without data on your actual times.</strong></p>\n<p>Scheduling is based on a subjective perception of the time needed, rather than on concrete data. If the actual time spent on tasks has never been measured, there are no realistic reference points on which to build an estimate.</p>\n</li>\n<li>\n<p><strong>When executing, not checking intermediate deadlines.</strong></p>\n<p>When no intermediate deadlines are set, it becomes hard to notice in time that a task is taking longer than expected. The delay only emerges when the final deadline is approaching or has already passed, making it harder to step in.</p>\n</li>\n</ol>\n<p>Identifying the causes of missed deadlines shows you where to act to really solve the problem. These are the gaps to close in order to move from temporary fixes to a concrete and lasting solution.</p>\n<p>The practical tips that follow turn this analysis into specific actions, designed to address the causes identified and improve the way deadlines are set, scheduled and managed.</p>\n<h2 id=\"practical-tips-for-meeting-deadlines\" class=\"article-h2-retrowave\"><span>Practical tips for meeting deadlines</span><button type=\"button\" class=\"article-heading-link\" data-copy-id=\"practical-tips-for-meeting-deadlines\" aria-label=\"Copy link to section\"><svg xmlns=\"http://www.w3.org/2000/svg\" width=\"16\" height=\"16\" viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M9 17H7A5 5 0 0 1 7 7h2\"/><path d=\"M15 7h2a5 5 0 1 1 0 10h-2\"/><line x1=\"8\" x2=\"16\" y1=\"12\" y2=\"12\"/></svg></button></h2>\n<p>To tackle the problem of missed deadlines, you can adopt a few measures that improve the agreement phase, scheduling and the monitoring of execution, acting directly on the real causes of the problem.</p>\n<ol class=\"article-process-list\">\n<li>\n<p><strong>Don't answer right away.</strong></p>\n<p>Before committing to a deadline date, it is important to check your schedule.</p>\n<p>Taking the time to analyze the phases of the task, consider the variables that can affect its duration and check the rest of your schedule allows you to make a more realistic estimate.</p>\n<p>It is also useful to make a first estimate in private, without being directly under pressure from the client. That way, the forecast can be based on an assessment of the work and not only on the need to give an immediate answer.</p>\n</li>\n<li>\n<p><strong>Measure your own times.</strong></p>\n<p>Recording how much time you actually spend completing tasks lets you build a data set that is useful for future estimates.</p>\n<p>Your forecasts can then start from actual average times, rather than from a subjective perception or an imprecise memory.</p>\n<p>Starting to measure your times means getting in touch with the real timelines of your tasks and gaining more reliable reference points for scheduling.</p>\n</li>\n<li>\n<p><strong>Set intermediate milestones and delay signals.</strong></p>\n<p>Breaking the work down into intermediate milestones lets you check progress step by step and see early on whether delays are building up.</p>\n<p>When a project is large, it can be hard to estimate the final deadline precisely. In these cases, you can set a first deadline and treat the following ones as forecasts to be updated during execution.</p>\n<p>From one milestone to the next, forecasts can be confirmed or adjusted based on the actual progress of the work.</p>\n<p>Delay signals are indicators that let you check whether the activities planned for each milestone have been completed on time. This way, you can spot early any deviation from the schedule and step in before the delay jeopardizes the final deadline.</p>\n</li>\n</ol>\n<p><picture><source type=\"image/avif\" srcset=\"/article-assets/rispettare-le-scadenze/rispettare-le-scadenze-tre-passi-480w.avif 480w, /article-assets/rispettare-le-scadenze/rispettare-le-scadenze-tre-passi-960w.avif 960w, /article-assets/rispettare-le-scadenze/rispettare-le-scadenze-tre-passi-1600w.avif 1600w\" sizes=\"(min-width: 1024px) 860px, 100vw\"><source type=\"image/webp\" srcset=\"/article-assets/rispettare-le-scadenze/rispettare-le-scadenze-tre-passi-480w.webp 480w, /article-assets/rispettare-le-scadenze/rispettare-le-scadenze-tre-passi-960w.webp 960w, /article-assets/rispettare-le-scadenze/rispettare-le-scadenze-tre-passi-1600w.webp 1600w\" sizes=\"(min-width: 1024px) 860px, 100vw\"><img src=\"/article-assets/rispettare-le-scadenze/rispettare-le-scadenze-tre-passi.jpg\" alt=\"Three steps for meeting deadlines: 1. take some time before agreeing to a deadline; 2. break the task down into phases and estimate the time for each phase; 3. only agree to deadlines you can keep\" width=\"1600\" height=\"606\" loading=\"lazy\" decoding=\"async\" class=\"article-inline-image\"></picture></p>\n<p><strong>Final check</strong></p>\n<p>Before setting a deadline, it helps to check a few elements that allow you to define a realistic and achievable term.</p>\n<ol class=\"article-process-list\">\n<li><strong>What exactly needs to be delivered?</strong> The result to be delivered must be defined unambiguously, so that it is clear which goal has to be reached.</li>\n<li><strong>Has the work been broken down into phases, with the time estimated for each one?</strong> Splitting the task into phases helps you better understand the work required and estimate its overall duration.</li>\n<li><strong>Is the estimate based on real data (similar tasks, your own or other people's)?</strong> Using concrete reference points makes the forecast more accurate than an estimate based only on gut feeling.</li>\n<li><strong>Does this task have time blocked out in the calendar?</strong> Checking that the work has time actually available in your schedule helps you see whether the deadline is compatible with your other commitments.</li>\n<li><strong>Does this task depend on someone else (materials, answers, approvals)? What will you do if something goes wrong?</strong> Identifying dependencies on other people or external factors lets you consider the variables that could jeopardize the timeline and decide how to deal with them.</li>\n</ol>\n<p>Checking these points before setting a deadline allows you to define a term based on the work to be done, the available resources and the conditions needed to meet it.</p>\n<p>In conclusion, missing deadlines is not just a matter of delays or lack of time. Often the problem starts much earlier, when terms are agreed without checking their feasibility, work is planned on rough estimates and progress is not monitored.</p>\n<p>As scientific research shows, the tendency to underestimate time is widespread and can be fueled by excessive optimism, personal interests, social pressure and an inaccurate assessment of past experience. The consequences, however, go well beyond a late delivery: costs rise, backlogs build up, the quality of the work suffers and you risk losing other people's trust.</p>\n<p>The solution, then, is not to work longer or to keep finding new time buffers, but to agree on realistic deadlines that fit the available resources. To do so, you need to base estimates on concrete data, check your schedule before making a commitment and monitor the work through intermediate milestones.</p>\n<p>Meeting a deadline, ultimately, means above all creating from the start the conditions that allow it to be met, without having to sacrifice the quality of the work, your other commitments or your own time.</p>\n<h2 id=\"sources-and-references\" class=\"article-h2-retrowave\"><span>Sources and references</span><button type=\"button\" class=\"article-heading-link\" data-copy-id=\"sources-and-references\" aria-label=\"Copy link to section\"><svg xmlns=\"http://www.w3.org/2000/svg\" width=\"16\" height=\"16\" viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M9 17H7A5 5 0 0 1 7 7h2\"/><path d=\"M15 7h2a5 5 0 1 1 0 10h-2\"/><line x1=\"8\" x2=\"16\" y1=\"12\" y2=\"12\"/></svg></button></h2>\n<p id=\"rif-1\" class=\"article-reference\">*1 Buehler, R., Griffin, D., &amp; Ross, M. (1994). Exploring the \"planning fallacy\": Why people underestimate their task completion times. Journal of Personality and Social Psychology, 67(3), 366–381.</p>\n<p id=\"rif-2\" class=\"article-reference\">*2 Flyvbjerg, B., &amp; Gardner, D. (2023). How Big Things Get Done: The Surprising Factors Behind Every Successful Project, from Home Renovations to Space Exploration. Crown Currency. ISBN: 9780593239513.</p>\n<p id=\"rif-3\" class=\"article-reference\">*3 Buehler, R., Griffin, D., &amp; MacDonald, H. (1997). The role of motivated reasoning in optimistic time predictions. Personality and Social Psychology Bulletin, 23(3), 238–247.</p>\n<p id=\"rif-4\" class=\"article-reference\">*4 Pezzo, S. V., Pezzo, M. V., &amp; Stone, E. R. (2006). The social implications of planning: How public predictions bias future plans. Journal of Experimental Social Psychology, 42(2), 221–227.</p>\n<p id=\"rif-5\" class=\"article-reference\">*5 Roy, M. M., Mitten, S. T., &amp; Christenfeld, N. J. S. (2008). Correcting memory improves accuracy of predicted task duration. Journal of Experimental Psychology: Applied, 14(3), 266–275.</p><aside class=\"article-byline\"><p class=\"article-byline__row\"><span class=\"article-byline__label\">Article content:</span> Marco Belzani</p><p class=\"article-byline__row\"><span class=\"article-byline__label\">Editorial team:</span> Dalia Bartiromo</p><p class=\"article-byline__row\"><a href=\"/en/editorial-team/\" class=\"article-byline__anchor\">About us and how we work</a></p></aside>","headings":[{"level":2,"text":"The problem: missing deadlines","id":"the-problem-missing-deadlines"},{"level":3,"text":"The hidden meaning in the definition of a deadline","id":"the-hidden-meaning-in-the-definition-of-a-deadline"},{"level":3,"text":"What science says about estimating time and meeting deadlines","id":"what-science-says-about-estimating-time-and-meeting-deadlines"},{"level":2,"text":"The effects of missed deadlines","id":"the-effects-of-missed-deadlines"},{"level":2,"text":"The right goal to aim for in meeting deadlines","id":"the-right-goal-to-aim-for-in-meeting-deadlines"},{"level":2,"text":"What leads to missed deadlines","id":"what-leads-to-missed-deadlines"},{"level":3,"text":"The most common false solutions for meeting deadlines","id":"the-most-common-false-solutions-for-meeting-deadlines"},{"level":3,"text":"The real causes of missed deadlines","id":"the-real-causes-of-missed-deadlines"},{"level":2,"text":"Practical tips for meeting deadlines","id":"practical-tips-for-meeting-deadlines"},{"level":2,"text":"Sources and references","id":"sources-and-references"}],"tldr":"","tldrItems":null}